Madison Mudjacking Job in Progress
This photo shows the steel pins that have been put into position by Mud Tech under this slab. After the pins were placed, we filled the large gaps in the sidewalk with new concrete. At this point it still looks a little rough - normally Mud Tech would back fill this next. In this case, the property owner wanted to do it himself.
The Completed Madison Mudjacking Project
MudTech leveled this slab, and made it much easier to use for all the UWM students living here.