
Illinois Company Helps Keep Projects on Schedule.
A deep foundation system installation came to a standstill at this Joliet residential property. Their foundation had been installed incorrectly and with inferior piles. As a result, they could not start building the rest of the house until repairs were made. They called MUDTeCH™ for help. Our first task was to remove the cement piles so we could have a fresh start installing the new foundation system. Then, we determined the best locations and depths to start drilling for maximum stability. Joliet helical pier installation from MUDTeCH™ let construction begin again.